Laguna Beach development tracker

This tracker follows named private development projects, public infrastructure and city plans in Laguna Beach. Each project shows its location, type, size where a source states one, its status in the source's own words, and a dated list of events with the publisher linked. Last checked October 13, 2026. Projects are grouped by stage, and a stage with no sourced project says so.

Under construction

No private project in the sourced set is listed as under construction. A construction start date appears here only when a source states one.

Approved

No private project in the sourced set is listed as approved.

In review or filed

Hotel Laguna rehabilitation

Location: 425 South Coast Highway (APN 644-016-01), Central Bluff District. Type: Rehabilitation of a hotel the record calls a historical resource: exterior changes, guest room renovations, lobby and corner cafe remodel, flat roof replacement and two vertical blade signs.

Status as the sources state it: Notice of exemption received; the notice states the project is categorically exempt (Class 1 and Class 31) (September 4, 2024).

Pacific Edge Hotel remodel and expansion

Location: 647 South Coast Highway and 667 Sleepy Hollow Lane. Type: Remodel of an existing hotel and resort complex, with a new automated parking garage, a previously entitled hotel building (Reef Wing) and cafe, and a variance for six new elevators that exceed the maximum building height. Size as stated by the source: 136 hotel rooms in total, 20 fewer than previously entitled.

Status as the sources state it: Notice of Determination received for the modified project, approved by the city on November 5, 2025, with an Addendum to the Pacific Edge Hotel MND (November 17, 2025).

Proposed or in studies

No private project in the sourced set is listed as proposed or in a study stage only.

Ribbon cutting reported

No private project in the sourced set has a reported ribbon cutting.

Infrastructure in the works in Laguna Beach

Public works are listed here with the listing publisher named, the status in the source's own words and a dated list of events. A budget line or a schedule is not a construction start, so a planned step appears under a separate schedule list and is not treated as having happened. Costs and funding appear only where a source states them.

Under construction

Anita Street Sewer Lift Station and Beach Access Stairs Reconstruction

Listed by: City of Laguna Beach. Location: West end of Anita Street, Laguna Beach. Type: Replacement of the sewer lift station and public beach access stairs, with installation of a permanent lifeguard tower.

Status as the sources state it: The city page records a groundbreaking ceremony and start of construction on June 23, 2025, and lists December 2026 as the anticipated project completion (June 23, 2025).

Schedule as listed by the source (planned, not a record that the step occurred):

Approved or awarded

Promenade on Forest (Lower Forest Avenue permanent pedestrian promenade)

Location: Lower Forest Avenue, between the Forest Avenue/South Coast Highway intersection and the Forest Avenue/Glenneyre Street intersection. Type: Permanent pedestrian plaza on Lower Forest Avenue, replacing a temporary pedestrian plaza; elements include seating for nearby restaurants, enhanced paving, drainage improvements and lighting.

Status as the sources state it: Modification of the design approvals for tree replacement filed as a notice of exemption. Earlier, the Coastal Commission found that neither appeal raised a "substantial issue" under the Coastal Act, and the source says the city's approvals stand without further review (June 12, 2026).

Fire Station No. 4 replacement (South Laguna)

Location: 31796 Coast Highway; the site record also lists 31786 Coast Highway. Type: Public project: two-story replacement fire station on a former dental office site. Size as stated by the source: approximately 9,250 sf, two-story (26 feet including roof).

Status as the sources state it: Coastal Commission found no substantial issue on the appeal, and Laguna Beach Independent reports the city can proceed (August 15, 2025).

In review or under negotiation

Downtown Specific Plan Phase II Update

Location: Citywide; Laguna Canyon Road, South Coast Highway/Highway 1, Legion Street, Forest Avenue, and Cliff Drive. Type: Specific plan update with a Draft EIR; the record says the project proposes to amend several housing-related provisions. Size as stated by the source: Total Acres 115.

Status as the sources state it: Notice of Preparation of a Draft EIR received; the city is the lead agency (January 26, 2026).

  • January 26, 2026: CEQAnet received a Notice of Preparation of a Draft EIR. The record lists "changes to building height, maximum residential density, lot merger regulations, Urban Design Guidelines, allowed uses, and parking requirements". It lists a public review period of January 27 to February 25, 2026. CEQAnet (State of California, Office of Land Use and Climate Innovation)

Laguna Canyon Road (SR-133) Caltrans relinquishment and city planning

Listed by: City of Laguna Beach. Location: State Route 133 (Laguna Canyon Road) between the El Toro Road intersection and Canyon Acres Drive, as the city page states the boundaries. Type: Road relinquishment from Caltrans to the city, with city planning for the Protect & Connect project. Amount as stated (cost): Preliminary cost estimate of $130 million, as reported by Laguna Beach Independent for the Protect & Connect project. Amount as stated (funding): Caltrans offer of $14.4 million for relinquishment (city page); roughly $14.4 million in "state of good repair" funds (Hoodline).

Status as the sources state it: The city held a town hall on relinquishment on May 28, 2026, and Hoodline reports a Caltrans offer of roughly $14.4 million; the two sources describe the August 2025 Council action differently (August 6, 2026, date of the Hoodline article).

Sources differ: The sources differ on the August 2025 Council action. The city page says Council considered the offer and tabled the item to the first meeting in November. Laguna Beach Independent says Council unanimously accepted the conditional offer. Both accounts are shown with their publishers.

Schedule as listed by the source (planned, not a record that the step occurred):

  • August 12, 2025: The city page says City Council considered the Caltrans financial offer of $14.4 million for relinquishment, and that Council tabled the item to the first meeting in November. City of Laguna Beach (Wayback capture 2026-07-12)
  • August 15, 2025: Laguna Beach Independent, in an article published on this date, reports that the City Council unanimously approved the next step in receiving Laguna Canyon Road, accepting a conditional Caltrans offer, with the city manager to negotiate an agreement. Laguna Beach Independent
  • August 15, 2025: Laguna Beach Independent, in the same article, states: "The preliminary cost estimate for this project is $130 million." Laguna Beach Independent
  • May 28, 2026: The city page says the city hosted a town hall on May 28, 2026. City of Laguna Beach (Wayback capture 2026-07-12)
  • August 6, 2026: Hoodline, in an article published on this date, reports that Caltrans has offered Laguna Beach roughly $14.4 million in "state of good repair" funds. Hoodline

In design or scheduled

Downtown Improvement (Ocean Avenue and Beach Street streetscape)

Listed by: City of Laguna Beach. Location: Ocean Avenue (Forest Avenue to South Coast Highway); Beach Street (Broadway Street to Ocean Avenue). Type: Streetscape, sidewalk, drainage and landscaping; the scope includes a widened sidewalk along Beach Street.

Status as the sources state it: Final engineering design contract awarded; the city page lists construction bidding, award of a construction contract and a construction start as scheduled steps, and this tracker has no source reporting that those steps have occurred (September 23, 2025).

Schedule as listed by the source (planned, not a record that the step occurred):

Glenneyre Street Lighting Improvement Project

Listed by: City of Laguna Beach. Location: Glenneyre Street, Forest Avenue to Caliope Street. Type: Streetlights: a total of 29 new streetlights.

Status as the sources state it: The city page says the project is currently in the design phase and is planned for construction in late 2026 (July 12, 2026, date of the archived city page).

Schedule as listed by the source (planned, not a record that the step occurred):

    Coast Highway Median Landscaping Upgrades

    Listed by: City of Laguna Beach. Location: Coast Highway, between Montage Resort Drive and Catalina Street. Type: Planting and irrigation within the raised medians built by Caltrans along Coast Highway.

    Status as the sources state it: The city page says construction is scheduled for Fall 2026 (July 12, 2026, date of the archived city page).

    Schedule as listed by the source (planned, not a record that the step occurred):

      Ribbon cutting reported

      Laguna Canyon Road: Protect & Connect (Segment 4)

      Location: Laguna Canyon Road. Type: Public road project: road widening, utility undergrounding, new bikeways and pedestrian paths, improved crossings, signal upgrades, enhanced transit stops and landscaping. Size as stated by the source: nearly $43 million project.

      Status as the sources state it: Ribbon cutting held, as reported by the Orange County Supervisor's office (August 4, 2026).

      • August 4, 2026: The Orange County Supervisor's office reported joining Caltrans, the California Transportation Commission, OC Parks and the City of Laguna Beach in cutting the ribbon on the project. The release describes a "nearly $43 million project to widen the road, add safer bike and pedestrian access" and says the County of Orange invested $11,156,584. Orange County Supervisor, 5th District (OC Board of Supervisors)

      City plans: the General Plan, specific plans and housing element

      The plans below are documents listed by the city on its land use, coastal, housing and budget pages. Each shows its kind, its adoption or status date where a source states one, and the page it comes from. Where two city pages describe the same plan differently, both statements appear with their sources.

      General Plan

      Kind: general plan. Status as the sources state it: The city's General Plan page lists the adopted elements, including Land Use Element (2025), Safety Element (2025), Historic Resources (2022), Housing 2021-2029, Human Needs (1976), Landscape and Scenic Highways (2018), Noise (2005), Open Space Conservation, and Transportation, Circulation and Growth Management (1992).

      • The city's General Plan is a collection of elements; the adopted elements are listed on the city's General Plan page, including a Land Use Element (2025) and Safety Element (2025). City of Laguna Beach
      • Safety Element dated 2025 is among the adopted elements. City of Laguna Beach
      • Other elements listed: Historic Resources (2022), Housing 2021-2029, Human Needs (1976), Landscape and Scenic Highways (2018), Noise (2005), Open Space Conservation, Transportation, Circulation and Growth Management (1992). City of Laguna Beach

      Local Coastal Program

      Kind: local coastal program. Adopted or certified: Certified by the California Coastal Commission on January 13, 1993. Status as the sources state it: Certified; the city page says the program delegates Coastal Development Permit authority from the Coastal Commission to the City, and that Blue Lagoon, Irvine Cove and Three Arch Bay are not covered by the program (January 13, 1993).

      • LCP certified by the Coastal Commission on January 13, 1993. City of Laguna Beach
      • The city page says the LCP delegates Coastal Development Permit authority from the Coastal Commission to the City, and lists Blue Lagoon, Irvine Cove and Three Arch Bay as areas not covered by the LCP. City of Laguna Beach
      • Land Use Element (2025) is an LCP component. City of Laguna Beach

      Housing Element 2021-2029 (6th Cycle)

      Kind: housing element. Adopted or certified: Approved by City Council on January 11, 2022; revised element re-adopted January 24, 2023; a revision approved on June 11, 2024. Status as the sources state it: Certified by the Department of Housing and Community Development on February 7, 2023; the city page also lists a revision approved by City Council on June 11, 2024 (February 7, 2023).

      Downtown Specific Plan

      Kind: specific plan. Status as the sources state it: Listed on the city's Local Coastal Program page as a component, Downtown Specific Plan (2022).

      • Listed as a component of the Local Coastal Program (Downtown Specific Plan (2022)). City of Laguna Beach

      Downtown Specific Plan Phase II Update

      Kind: specific plan. Area as stated by the source: Downtown Specific Plan area (115 acres per the CEQAnet filing). Status as the sources state it: CEQAnet recorded a Notice of Preparation of a Draft EIR on January 26, 2026; the city page lists a public scoping meeting for February 4, 2026 (January 26, 2026).

      Laguna Canyon Annexation Area Specific Plan

      Kind: specific plan. Status as the sources state it: Listed on the city's Local Coastal Program page as Laguna Canyon Annexation Specific Plan (1994).

      Treasure Island Specific Plan (Resort)

      Kind: specific plan. Status as the sources state it: Listed on the city's Local Coastal Program page as Treasure Island Specific Plan, Resort (1998).

      Other specific plans (Arch Beach Heights, Diamond-Crestview, Sarah Thurston Park)

      Kind: specific plan. Status as the sources state it: Listed on the city's Land Use Plans page.

      Capital Improvement Program (annual budget)

      Kind: capital improvement program. Status as the sources state it: The city's budgets page, as archived in March 2026, lists FY 2025-26 Adopted Budget (March 2, 2026).

      • The city adopts an annual update to the ten-year Capital Improvement Plan for the fiscal year beginning July 1. City of Laguna Beach
      • The city's CIP page describes a seven-year schedule in the annual budget (the two pages differ: ten-year vs seven-year). City of Laguna Beach
      • The city page at the March 2026 archive lists FY 2025-26 Adopted Budget. City of Laguna Beach

      How to read this tracker

      A filing is not an approval. A notice of preparation, a notice of exemption or a notice of determination is a record that the city or an applicant has moved a project through an environmental step. Read the status line on each project for the exact words the source uses, and do not assume the next step has happened.

      An approval is not a construction start. A decision on record and work under way are different facts, so look for a source that states the start of work before assuming it. A ribbon cutting, a notice of determination and a notice of exemption each record one event only.

      Dates are the source's dates. Each event carries the date the source gives, and the project status carries its own date. The record dates shown in the sources list are the dates the publisher posted the item, which can differ from the decision date.

      Where two sources describe the same project differently, both appear as separate dated events with the publisher named, and the project is grouped by the latest dated source. Nothing on this page predicts a hearing date, a completion date or an outcome. A hearing or completion date appears only when a source states one.

      What to ask about a project near your property

      If you own or lease space near one of these projects, start with the stage. Ask the city planning counter which step the project is in today and which step is next, then compare the answer with the status line above.

      If your building sits inside the Downtown Specific Plan area, ask the city whether the Phase II amendments on height, residential density, lot merger rules, allowed uses and parking apply to your parcel, and whether any comment period or hearing is scheduled.

      Ask what the project record says about parking, access and construction staging. For Forest Avenue, the 48-space parking figure is the appellants' statement as reported by Laguna Beach Independent, so compare it with the city's own record.

      If you are weighing a purchase or a lease renewal, ask the seller or landlord what they know about each nearby filing, and ask your lender, insurer or attorney whether a pending approval or appeal changes the terms. This page is sourced research, not California brokerage advice.

      If a project near a property you own or are considering could change your plans, write down the address and the question before you reach out.

      Prepare a note about what you are weighing

      Questions people ask

      What is the status of the Promenade on Forest in Laguna Beach?

      CEQAnet records show the City Council approved the project on March 25, 2025, and the Planning Commission approved Design Review 25-0319 and Coastal Development Permit 25-0318 on April 2, 2025. The Council upheld the design review on June 11, 2025. Laguna Beach Independent reported the Coastal Commission found, at its August 15 meeting, that neither appeal raised a substantial issue. In June 2026 CEQAnet received a notice of exemption for a modification of the design approvals for tree replacement.

      What is the Downtown Specific Plan Phase II update?

      CEQAnet received a Notice of Preparation of a Draft EIR on January 26, 2026, with the City of Laguna Beach as lead agency. The record lists changes to building height, maximum residential density, lot merger regulations, Urban Design Guidelines, allowed uses and parking requirements across 115 total acres, with a public review period from January 27 to February 25, 2026. No hearing date is listed here.

      What is happening with the Pacific Edge Hotel on South Coast Highway?

      The Notice of Determination for the modified project gives November 5, 2025 as the city approval date, and CEQAnet received it on November 17, 2025. It covers the project at 647 South Coast Highway and 667 Sleepy Hollow Lane. The city prepared an Addendum to the Pacific Edge Hotel MND. The record states 136 hotel rooms in total, 20 fewer than previously entitled, plus a new automated parking garage. It also lists a variance for six new elevators that exceed the maximum building height. The applicant is Dune Drifter, LLC.

      Has the Laguna Canyon Road Protect and Connect project been completed?

      The Orange County Supervisor's office reported a ribbon cutting on August 4, 2026. It described a nearly $43 million project to widen the road, add safer bike and pedestrian access and underground utility lines. The release does not use the word completed, so this tracker lists the ribbon cutting as the reported event.

      What does the Hotel Laguna notice of exemption mean for the project?

      CEQAnet received a notice of exemption on September 4, 2024 for Design Review 22-2304 and Variance 24-0690 at 425 South Coast Highway, where the applicant is Hotel Laguna, LLC. The notice states the project is categorically exempt under Class 1 and Class 31. A notice of exemption is a CEQA record, so this tracker lists no permit decision or construction start for it.

      What public infrastructure work is in the works in Laguna Beach?

      The city's project pages list the Anita Street sewer lift station and beach access stairs, with a construction start recorded for June 23, 2025, plus Downtown Improvement, Glenneyre Street lighting and Coast Highway median landscaping, each with a planned schedule. A schedule is not a start of work. The Laguna Canyon Road relinquishment is described differently by the city page and Laguna Beach Independent, so both accounts are shown.

      Which city plans apply to development in Laguna Beach?

      The city lists a General Plan made of separately dated elements, a Local Coastal Program certified by the Coastal Commission on January 13, 1993, and a 6th Cycle Housing Element certified by the state on February 7, 2023 with a 394-unit allocation. Specific plans include the Downtown Specific Plan, whose Phase II update had a Notice of Preparation recorded on January 26, 2026.

      Sources

      1. Promenade on Forest, CEQA record 2025040410, CEQAnet (State of California, Office of Land Use and Climate Innovation), published April 8, 2025. Accessed October 13, 2026.
      2. Promenade on Forest, CEQA record 2025060680, CEQAnet (State of California, Office of Land Use and Climate Innovation), published June 16, 2025. Accessed October 13, 2026.
      3. Coastal Commission rejects appeals on promenade, fire station, Laguna Beach Independent, published August 22, 2025. Accessed October 13, 2026.
      4. Forest Avenue emergency tree removals, CEQA record 2026060631, CEQAnet (State of California, Office of Land Use and Climate Innovation), published June 12, 2026. Accessed October 13, 2026.
      5. Fire Station No. 4 replacement, CEQA record 2022090383, CEQAnet (State of California, Office of Land Use and Climate Innovation), published November 17, 2022. Accessed October 13, 2026.
      6. Downtown Specific Plan Phase II update, CEQA record 2026010840, CEQAnet (State of California, Office of Land Use and Climate Innovation), published January 26, 2026. Accessed October 13, 2026.
      7. Hotel Laguna rehabilitation, CEQA record 2024070425, CEQAnet (State of California, Office of Land Use and Climate Innovation), published September 4, 2024. Accessed October 13, 2026.
      8. Pacific Edge Hotel, CEQA record 2020100528, CEQAnet (State of California, Office of Land Use and Climate Innovation), published November 17, 2025. Accessed October 13, 2026.
      9. City of Laguna Beach, Anita Street Sewer Lift Station and Beach Access project page (archive capture), City of Laguna Beach (Wayback capture 2026-07-12), published July 12, 2026. Accessed October 13, 2026.
      10. City of Laguna Beach, Downtown Improvement project page (archive capture), City of Laguna Beach (Wayback capture 2026-07-12), published July 12, 2026. Accessed October 13, 2026.
      11. City of Laguna Beach, Glenneyre Street Lighting Improvement project page (archive capture), City of Laguna Beach (Wayback capture 2026-07-12), published July 12, 2026. Accessed October 13, 2026.
      12. City of Laguna Beach, capital improvement projects page (archive capture), City of Laguna Beach (Wayback capture 2026-07-12), published July 12, 2026. Accessed October 13, 2026.
      13. City of Laguna Beach, Laguna Canyon Road undergrounding page (archive capture), City of Laguna Beach (Wayback capture 2026-07-12), published July 12, 2026. Accessed October 13, 2026.
      14. City takes steps in Laguna Canyon Road relinquishment, Laguna Beach Independent, published August 15, 2025. Accessed October 13, 2026.
      15. Laguna Beach buries power lines on Canyon Road, Hoodline, published August 6, 2026. Accessed October 13, 2026.
      16. Laguna Canyon Road ribbon cutting, Orange County Supervisor, 5th District (OC Board of Supervisors), published August 4, 2026. Accessed October 13, 2026.
      17. General Plan, City of Laguna Beach page, City of Laguna Beach, undated page. Accessed October 13, 2026.
      18. Treasure Island Specific Plan (Resort), City of Laguna Beach page, City of Laguna Beach, undated page. Accessed October 13, 2026.
      19. Housing Element 2021-2029 (6th Cycle), City of Laguna Beach page, City of Laguna Beach, published January 11, 2022. Accessed October 13, 2026.
      20. Downtown Specific Plan Phase II Update, City of Laguna Beach page, City of Laguna Beach, published February 4, 2026. Accessed October 13, 2026.
      21. Downtown Specific Plan Phase II Update, California Office of Land Use and Climate Innovation (CEQAnet) page, California Office of Land Use and Climate Innovation (CEQAnet), published January 26, 2026. Accessed October 13, 2026.
      22. Other specific plans (Arch Beach Heights, Diamond-Crestview, Sarah Thurston Park), City of Laguna Beach page, City of Laguna Beach, undated page. Accessed October 13, 2026.
      23. Capital Improvement Program (annual budget), City of Laguna Beach page, City of Laguna Beach, published March 2, 2026. Accessed October 13, 2026.
      24. Capital Improvement Program (annual budget), City of Laguna Beach page, City of Laguna Beach, undated page. Accessed October 13, 2026.